Most Recent Articles by

Henry Williams

Buhari Has No Plan for Another Medical Trip to London – Presidency

The Presidency has declared that President Muhammadu Buhari has no immediate plan to embark on another medical trip to London, the United Kingdom. The social...

JAMB releases UTME mock results

The Joint Admissions and Matriculation Board has released the results of the 2022 mock Unified Tertiary Matriculation Examination conducted on April 9. JAMB made this...

Nakuru police arrest five over attack on S. Sudanese

Five people have been arrested in connection to the recent arson attack on South Sudanese nationals in Nakuru which left one dead and four...

Palestinians attack biblical figure Joseph’s tomb in West Bank

The tomb where the biblical figure Joseph is said to be buried has been vandalised by Palestinians amid spiralling tensions with Israel. The site in...

Advertisement

spot_img
1731 Articles written

Read Now

FAAN Clears Bolt To Resume Airport Operations, Says It Does Not Set Taxi Fares

The Federal Airports Authority of Nigeria (FAAN) has approved Bolt to immediately resume ride-hailing services at Nigerian airports after reaching an operational agreement with the platform. The development follows a dispute between FAAN and the ride-hailing company that temporarily disrupted Bolt’s airport operations and sparked complaints from passengers. In...

BREAKING: Ibrahim Gusau Officially Resigns As NFF President

President of the Nigeria Football Federation, Ibrahim Musa Gusau, has resigned from his position, alongside several members of the NFF Executive Committee, amid mounting pressure over the administration of Nigerian football. The resignation comes after a difficult period for Nigeria’s national teams, including the Super Eagles’ failure to...

FG Says 60% Of Active Electricity Consumers In Nigeria Now Have Meters

The Federal Government says about 60 per cent of active electricity consumers across Nigeria have now been provided with meters as efforts continue to reduce estimated billing and improve transparency in the power sector. The ongoing metering exercise is being carried out under Phase 1 of the $500...