Pakistan 1014MW Power Plant Reaches Full Power Operation For 1st Time

Unit 3 of the Karachi nuclear power plant in Pakistan has reached full power operation for the first time, a milestone reached on 31 March 2022.

The 1014MW power plant includes an HPR1000 pressurised water reactor and is owned and operated by Pakistan Atomic Energy Commission.

HPR 1000 or Hualong One is a 3rd-generation nuclear power brand jointly developed by the China National Nuclear Corporation (CNNC) and the China General Nuclear Power Group (CGN).

According to CNNC, the HPR 1000 design was based on more than 30 years of nuclear power research and is capable of mass production.

Karachi unit 3 is the world’s fourth Hualong One unit and China’s second unit overseas. Units 2 and 3 are the result of nuclear cooperation between China and Pakistan, a country participating China’s Belt and Road Initiative.

The nuclear project not only provides stable electricity to Karachi, but is also viewed as a way to enhance confidence in Hualong One across countries and regions participating in the Belt and Road Initiative.

According to the World Nuclear Association, Pakistan has six operable reactors supplied by China.


Discover more from LN247

Subscribe to get the latest posts sent to your email.

Advertisement

Most Popular This Week

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

More from Author

Advertisement

Read Now

South Africa-Botswana Border Closed Due to Heavy Rainfall and Flooding

The South African Border Management Authority has temporarily shut down the Grobler’s Bridge crossing between South Africa and Botswana due to severe rainfall and flooding in the region. This critical border post, located in northern South Africa, is a vital trade route, particularly for miners from Zambia and...

Federal Fire Service to Enforce Mandatory Fire Insurance for Buildings

The Federal Fire Service is set to mandate fire insurance as part of its building inspection checklist. This decision emerged from a strategic meeting between the National Insurance Commission (NAICOM) and the Federal Fire Service at the NAICOM headquarters, aimed at strengthening their collaboration. Fire insurance provides coverage...

South Sudan’s Displaced Families Struggle Amid Rising Floods

South Sudan's seasonal flooding, once a natural part of the country's climate, has now turned into an annual catastrophe, displacing hundreds of thousands and worsening the humanitarian crisis. Families, like that of Nyabuot Reat Kuor, a mother forced from her home in Gorwai, are bearing the harshest...

Discover more from LN247

Subscribe now to keep reading and get access to the full archive.

Continue reading